31 days left to respond
Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY)
DEPT OF DEFENSE
Plain-English Summary
The Dept Of Defense is looking for two phase design-build/design-bid-build (db/dbb) multiple award task order contract (matoc) for construction of the ground based strategic deterrent (gbsd) utility corridor (uc) at francis e. warren air force base (few afb), wyoming (wy). Responses are due in 31 days (September 3, 2026).
Contract Details
- Solicitation #
- W9128F26RA017
- Type
- Solicitation
- NAICS Code
- 237130
- PSC Code
- Y1NZ
- Posted
- August 3, 2026
- Response Deadline
- September 3, 2026
Agency & Contact
- Department
- DEPT OF DEFENSE
- Sub-agency
- DEPT OF THE ARMY
- Office
- US ARMY CORPS OF ENGINEERS / ENGINEER DIVISION NORTHWESTERN / ENDIST OMAHA / W071 ENDIST OMAHA
- Point of Contact
Who Should Bid
- Businesses classified under NAICS 237130
- Open to all businesses (no set-aside restrictions)
- Must be registered in SAM.gov with active status
- Must have relevant past performance or capability statement
Tips for Winning This Contract
- You have time to prepare a thorough response — use it for teaming arrangements or subcontracting
- Contact the contracting officer with questions BEFORE the deadline — they want to help qualified bidders
- Review the full solicitation documents on SAM.gov for detailed requirements
- Check if there's an industry day or Q&A session listed
View Full Solicitation on SAM.gov
Download attachments, full requirements, and submit your response on SAM.gov
Similar Opportunities
COMMUNICATIONS SITE INFRASTRUCTURE IDIQ
INTERIOR, DEPARTMENT OF THEDue 9/3/2026Small Business Set Aside - Total
Solar Construction on New Building
AGRICULTURE, DEPARTMENT OFDue 8/11/2026Small Business Set Aside - Total
Nez Perce - Clearwater National Forest - Kelly Forks Work Center Emergency Electrical Repairs
AGRICULTURE, DEPARTMENT OFDue 8/5/2026Small Business Set Aside - Total
SJG SOLAR/BPS/POWER CONDITIONING
INTERIOR, DEPARTMENT OF THEDue 8/31/2026
Y--North Gunnison Substation 115kV Switch Installation
ENERGY, DEPARTMENT OF